United States v. Sawyer

by
Sawyer, with co-defendants, formed A&E to recover salvageable materials (copper, steel, aluminum) from the 300-acre Hamblen County site of the former Liberty Fibers rayon plant, which contained buildings, a water treatment facility, and extensive above-ground piping. The defendants knew that many of the buildings contained regulated asbestos-containing material (RACM), such as pipe-wrap, insulation, roofing, and floor tiles, much of which was marked. Demolition did not comply with National Emission Standards for Hazardous Air Pollutants (NESHAP) governing the handling and disposal of asbestos. Workers were not provided with proper respirators or protective suits; some were asked to remove or handle friable asbestos without adequately wetting it. In a 2008 consent agreement, A&E agreed to correct the violations and comply with NESHAP during future removal and demolition. In 2009, the EPA terminated the agreement and issued an immediate compliance order. Federal agents searched the site, seized documents, and took samples of RACM. EPA, acting under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), cleaned up the site, at a cost of $16,265,418. In 2011, Sawyer and his co-defendants were charged. Sawyer pled guilty to conspiring to violate the Clean Air Act, 18 U.S.C. 371. His PSR calculated a guideline sentencing range of 87-108 months. The statutory maximum under 18 U.S.C. 371 is 60 months, so his effective range was 60 months. The Sixth Circuit affirmed Sawyer’s 60-month sentence and an order holding the co-defendants jointly and severally liable for $10,388,576.71 in restitution to the EPA. View "United States v. Sawyer" on Justia Law